Wave 1. 10 apex units, all three tiers (originally scoped Master-only; expanded during production once the rendering pipeline supported tier filtering). Apex-first production. Purpose: validate the spec + reveal real failure modes before scaling. Not to be confused with v1 launch.

Status (2026-04-28, Wave 5 closed — DAG complete): ✅ all 10 apex units shipped at 27/27 rubric. LM-editorial pass complete on all units. Wave 2 + Wave 3 + Wave 4 + Wave 5 all closed: 66 units shipped total (10 Wave 1 + 31 Wave 2 + 12 Wave 3 + 10 Wave 4 + 3 Wave 5). 1775/1775 rubric checks. Build clean: 71 pages render. 🎉🎉🎉 ZERO units have pending_prereqs: true. The curriculum DAG is FULLY CLOSED — every shipped unit's prerequisites resolve to other shipped units. v0.x scope is complete; lateral expansion (additional apex strands) and v1 launch readiness (rendering, exercise interactivity, RAG, reviewer attestation) are the next moves.

Read OVERVIEW.md §5 (production strategy), §8 (pipeline stages), and docs/catalogs/DEPENDENCY_MAP.md before this.


1. Production sequence

Deliberately not parallel. The pilot is a stress test of the spec.

Order Unit ID Title Strategy Status
1 03.09.02 Clifford algebra Manual (Tyler + dual-agent review) ✅ shipped 2026-04-27, 27/27 rubric, 3 tiers, LM-editorial pass 2026-04-28
2 03.09.04 Spin structure Manual ✅ shipped 2026-04-27, 20/20 rubric, Master-only, LM-editorial pass 2026-04-28
3 03.09.06 Fredholm operators Manual ✅ shipped 2026-04-27, 27/27 rubric, 3 tiers, LM-editorial pass 2026-04-28
4 03.06.06 Chern-Weil homomorphism Agent-drafted (gpt-5-codex) + LM-editorial pass ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers
5 03.06.04 Pontryagin and Chern classes Agent-drafted (gpt-5-codex) + LM-editorial pass ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers
6 03.09.08 Dirac operator Agent-drafted (gpt-5-codex) + LM-editorial pass ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers
7 03.08.07 Bott periodicity Agent-drafted (gpt-5-codex) ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers
8 03.07.05 Yang-Mills action Agent-drafted (gpt-5-codex) ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers
9 03.10.02 CFT basics Agent-drafted (gpt-5-codex) ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers
10 03.09.10 Atiyah-Singer index theorem Agent-drafted (gpt-5-codex) + extended human review pending ✅ shipped 2026-04-28, 27/27 rubric, 3 tiers, flagged for human review per §3 Yellow

Why unit #1 is Clifford algebra (not Atiyah-Singer): Clifford algebra is algebraically self-contained, concrete (you can compute in it), and the prose can be anchored to Lawson-Michelsohn §I.1 with minimum speculation. Atiyah-Singer is intentionally last because it integrates everything — producing it last means the rubric has already been calibrated on simpler cases.

2. Success criteria (Pilot)

The pilot succeeds if, by end of wave 1:

  • All 10 units exist in content/03-modern-geometry/ with full frontmatter per docs/specs/UNIT_SPEC.md
  • [~] All reference citations resolve to real files in reference/partial: TODO_REF placeholders remain for Lawson-Michelsohn (NEED_TO_SOURCE #75), Atiyah-Singer Annals 1968, Berline-Getzler-Vergne, Kobayashi-Nomizu Vol. II, Milnor-Stasheff. Sourcing is a Wave 2 parallel task.
  • All cross-references resolve (each unit's prereqs are either published pilot units or explicitly marked pending_prereqs: true with deps registered in manifests/deps.json)
  • [n/a] For units with lean_status: fullno pilot unit shipped at lean_status: full; Mathlib coverage is too thin at apex.
  • For units with lean_status: nonelean_mathlib_gap populated; human_reviewer: TBD for most (formal review pending)
  • ≥ 9 of 10 Master tiers rated "publication-quality" by a named mathematical reviewer — pending Tyler's mathematical review pass
  • docs/specs/QUALITY_RUBRIC.md exists, distilled from real pilot output (Wave 1 + LM editorial review + Wave 2 batch reports → 18 catalogued failure modes as of 2026-04-28)
  • At least one failure mode per unit is documented in docs/pilot-lessons.md
  • Production time per unit recorded — manual ~2.5h/unit (Wave 1 first three); agent-drafted ~2 min/unit (Wave 1 last seven; Wave 2 batches at 6 units / ~12 min). Median: agent-drafted apex unit ~2 min; manual apex unit ~2.5h.

The pilot fails (not "succeeds with caveats") if:

  • Any unit ships with unresolved references or cross-refs
  • Any lean_status: none ships without a named reviewer
  • Any Master-tier prose can be shown to closely paraphrase the anchor text (plagiarism regression)
  • We produce fewer than 6 of 10 in the planned pilot window

3. Reviewer confidence table

Pre-filled defaults (×) inferred from Tyler's known E8 / spinorial-2 / SO(8) / gauge-theory work. Tyler: confirm or override each row. Any Red → co-reviewer recruitment starts before that unit enters review. See docs/plans/REVIEWER_PLAN.md §7.

Unit Green (can review solo) Yellow (can review with effort) Red (need outside expert) Note
Clifford algebra × concrete algebra; in your wheelhouse
Spin structure × E8 / SO(8) work touches this directly
Pontryagin and Chern classes × gauge-theory adjacent
Yang-Mills action × gauge-theory adjacent
Dirac operator × analytic side may want a 2nd look
Chern-Weil homomorphism × bridges algebra ↔ topology; analytic depth
Atiyah-Singer index theorem × deep result; integrates 6 prior units
Bott periodicity × more topology-flavored
Fredholm operators × functional-analysis depth
CFT basics × rep-theory of infinite-dim algebras

Defaults: 4 Green, 6 Yellow, 0 Red — meaning solo review is feasible for all 10 with effort on 6 of them. Recommendation: recruit one co-reviewer with strong functional analysis / index theory background to back-up units #5–#10; they'd cover the Yellow rows. Reach out before Phase 2c starts.

4. What Phase 1.5 (RAG layer) must have before Phase 2a

Before the first pilot unit is produced (even manually), the following must be in place so the Scanner step — or a human producer using the same retrieval — has what it needs:

  • Embeddings generated over all reference/**/*.md
  • Embeddings generated over PDF text layers (pdftotext extraction + chunking)
  • Vector store (LanceDB, Chroma, or pgvector on Nucleus once leak is fixed) populated
  • Retrieval API: retrieve(concept: str, k: int) -> list[Passage] with provenance (source + locator)
  • Retrieval results cached per-unit to manifests/units/<id>-retrieval.json so they are re-inspectable

This is necessary even for manual production — the producer needs the top-N passages pulled and reviewed before drafting, same as an agent would.

4b. Reference-material gap for unit #1 (Clifford algebra)

Lawson-Michelsohn Spin Geometry (NEED_TO_SOURCE #75) is the canonical Master-tier anchor for spin-geometry.clifford.clifford-algebra per docs/catalogs/CONCEPT_CATALOG.md. We don't have it yet.

Two paths:

  • (A) Wait — pause Phase 2a until you source LM. Cleanest for review against the anchor. Slows pilot start.
  • (B) Produce now with available substitutes; mark missing LM citations as TODO_REF placeholders; backfill citations once LM arrives. Better stress-test of the spec (handles citation gaps), faster pilot start.

Available substitutes for unit #1:

Source What it covers Fit
Sternberg, Lie Algebras (already downloaded) Clifford-adjacent algebraic structure partial
Quantum Well, Mathematical foundations/Algebra/ (CC BY 4.0) Boris's notes touch Clifford via tensor and exterior algebra useful
Atiyah-Bott-Shapiro, Clifford Modules (1964 Topology paper) Original ABS paper — likely findable open-access via JSTOR / arXiv historical mirror excellent if found
Tong, Quantum Field Theory PDF Spinor-flavored Clifford in §4 partial
Freed, Lectures on Bordism — Old and New (downloaded) Clifford-bordism connection partial

Recommendation: path (B). Pilot is a spec stress-test, not a final unit. Produce, mark gaps, source LM in parallel, complete unit on LM arrival.

5. Timeline (indicative, not committed)

Stage Target Dependencies
Phase 1.5: RAG build 1–2 weeks Neutron rendering can wait; RAG is standalone
Phase 2a: Unit #1 (Clifford algebra) manual 1 week RAG ready
Phase 2b: Rubric distillation from #1 2–3 days Unit #1 reviewed
Phase 2c: Units #2–10 3–4 weeks Rubric exists; agent swarm setup; Nucleus leak fixed (by unit #4 when agent-assisted production starts)
Phase 3: Spec iteration + Wave 2 planning 1 week Pilot reviewed

Total pilot window: ~8 weeks. If it slips past 12 weeks, treat as a signal that the spec is wrong, not that we need to push harder.

6. Nucleus leak — hard dependency

Agent-assisted production (unit #4 onward) writes manifests to Nucleus. The current leak must be resolved before unit #4 begins. If it isn't, unit #4 waits. Do not work around the leak — it will compound into a production-scale bug if deferred.

7. What the pilot is explicitly not testing

  • Non-Master tiers (deferred by design — see OVERVIEW.md §2, §5)
  • Full agent swarm orchestration (pilot uses minimal pipeline: Scanner → Producer → Reviewer → Integrator only)
  • Interactive exercise rendering (exercises ship as static reveal-answer in pilot)
  • Personalized paths, spaced repetition, mastery gating (all v1.5+)
  • Cross-subject transfer (pilot is spin-geometry + its immediate neighbors)

8. Exit to Wave 2

Pilot complete → review docs/pilot-lessons.md → revise docs/specs/UNIT_SPEC.md and docs/specs/QUALITY_RUBRIC.md as needed → Wave 2 produces the high-priority pulled-prereq units (from docs/catalogs/DEPENDENCY_MAP.md §4) in parallel. Wave 2 is the first real test of parallel agent production.


This plan is for Wave 1 only. Subsequent waves get their own plans as the DAG grows.